Office Lift and Door Refurbishment

The Brief

Spring Gardens, a prominent office building in the centre of Manchester, underwent a wider refurbishment designed to attract new tenants and modernise the building’s interior spaces. As part of this programme, Cubic Works appointed Fusion Surfaces to carry out an office lift and door refurbishment. The project involved upgrading the interiors and exteriors of the building’s lifts as well as refurbishing 20 internal doors.The goal was to introduce finishes that aligned with the building’s new design scheme while avoiding the disruption and cost associated with replacing the existing fixtures.

Location:
Manchester
Duration:
4 days
Sector:
Corporate Offices

The Solution

Architectural vinyl wrapping offered an efficient way to modernise both the lifts and the doors without replacing them.

Working alongside Cubic Works, we selected finishes from the LX Hausys Benif architectural film range. A dark wood effect was chosen for the doors to complement the wider interior design, including the building’s new green marble bathrooms and dark blue panelling within the lobby.

For the lifts, a bronze and white palette replaced the previous clinical stainless steel appearance, creating a more refined and welcoming environment for building occupants.

The Process

Preparation and coordination were essential to ensure the refurbishment progressed smoothly within the wider fit-out programme.

Following the approval of materials, a team of two installers carried out the wrapping works. The project was organised in stages so that the lifts remained functional while refurbishment took place. At the same time, the door upgrades were completed carefully to maintain consistency with the surrounding interior finishes.

By working methodically through each area, the team delivered the installation on schedule and within the client’s refurbishment timeline.

The Transformation

The completed refurbishment introduced a noticeably more sophisticated interior across the building.

Previously plain grey doors now feature a dark wood finish that adds warmth and depth to the office corridors. Meanwhile, the lifts underwent the most dramatic transformation, moving from a sterile stainless steel appearance to a design that reflects the quality of the wider fit-out.

Through office lift and door refurbishment, the building achieved a modern, high-end look without replacing its existing fixtures.

office door refurbishment with interior film

Client Advantages

The project delivered several benefits for Cubic Works and the building’s owners:

 

  • Lift interiors and exteriors upgraded without replacement

  • 20 internal doors refurbished to match the new interior design

  • Architectural film selected for durability and fire compliance

  • Installation coordinated alongside a wider building refurbishment

  • Significant cost savings compared with replacing lifts and doors

 

Furthermore, refurbishing the existing surfaces reduced waste and supported a more sustainable refurbishment strategy.

Conclusion

The Spring Gardens project demonstrates how office lift and door refurbishment can modernise commercial buildings quickly and efficiently.

By combining architectural vinyl wrapping with careful planning, Fusion Surfaces delivered a high-quality transformation that complements the wider refurbishment of the building. The result is a more contemporary office environment designed to attract new tenants while preserving existing fixtures.

why fusion surfaces?

GET IN TOUCH TODAY!

Follow Us

MESSAGE

GET IN TOUCH TODAY!

Follow Us

MESSAGE

Rosie Christie

Co-Founder

Older than the rest of the team, but not necessarily wiser as she’d like to think. There’s not an activity under the sun that she’s not been willing to have a go at, resulting in a mediocre ukulele player, part-time blogger, one-time skydiver and an unfinished sitcom script. There’s no room for shades of grey in this half of the partnership; everything comes down to looking after people who are important.

Organising tradesmen is not a task for the fainthearted. But recruiting the right tradesmen, ones who align with our values and are highly skilled at what they do makes for a much more harmonious project management process. Rosie’s role begins with a meeting to discuss your requirements, providing you with a quotation and carries through to the on-site management of your project.

Jade Mitchell

Co-Founder

She’s the only Southerner on the team, but we try not to hold it against her too much. If anything, we’ve enjoyed introducing Jade to a vast number of pie shops now she’s a Northern resident. Standing at a phenomenal 5’2”, she is living proof that big things come in small packages; a mix of infectious enthusiasm, laughter, loyalty, authority and uncanny Theresa May impressions.

Communicating with our clients is Jade’s forte. Being highly organised and placing customer satisfaction at the forefront of everything she does means that from enquiry to completion, your queries will be dealt with efficiently. For an in depth knowledge of the material specification of our interior film, Jade is your woman. She will put your mind at rest that not only do we install this product, but we make sure that is the most suitable for your needs.