College Bathroom Refurbishment

The Brief

Manchester College wanted to modernise six student bathrooms across their campus before the start of the new academic year. The existing facilities were dated and no longer reflected the college’s brand identity or the standard they wanted to present to students. Fusion Surfaces was therefore asked to manage the project, combining architectural vinyl wrapping with other refurbishment works to deliver a complete solution. The objective was to complete the college bathroom refurbishment during the summer holiday period, ensuring the facilities were ready for students returning.

Location:
Manchester
Duration:
4 weeks
Sector:
Education

The Solution

During the consultation stage, Rosie met with the Head of Facilities to assess the existing bathrooms and understand how the spaces were used daily.

The college had previously explored both spray painting the cubicles and replacing them entirely. However, both options came with drawbacks in terms of durability, cost and disruption.

Instead, we proposed refurbishing the existing cubicle systems using architectural vinyl wrapping from the LX Hausys RS range, combined with hygiene wall cladding and other supporting works. This approach allowed the college to retain the existing structures while achieving a completely refreshed appearance.

Working alongside the college’s team, we selected a bold yellow and grey colour scheme that aligned with the college branding and introduced a more vibrant atmosphere for students.

The Process

Before proceeding with the full installation, two trial bathrooms were completed to ensure the college was completely satisfied with the materials and finish.

Once approved, work began on the remaining four bathrooms during the summer break. The refurbishment required significant preparation before wrapping could begin.

Existing urinals and IPS panels were deep cleaned, tiles were removed and the walls were re-plastered before hygiene wall cladding was installed. Our team then dismantled the cubicle systems so the panels could be wrapped properly before reinstallation.

Two installers completed the project over four weeks, working alongside plumbers, joiners and other contractors to keep the programme on schedule.

The Transformation

The completed refurbishment dramatically improved the look and feel of the bathrooms.

Bold yellow cubicles combined with grey finishes introduced a vibrant and modern environment that reflects the college’s branding. What were once tired student facilities now present a bright and welcoming space for students and staff.

Through college bathroom refurbishment, the college achieved a high-quality interior upgrade without replacing the entire cubicle systems.

Client Advantages

The project delivered several benefits for Manchester College:

  • Six student bathrooms refurbished during the summer holiday period

  • Existing cubicle systems upgraded rather than replaced

  • Hygiene wall cladding installed to improve durability and cleanliness

  • Architectural film used to create a bold branded colour scheme

  • Reduced waste by retaining existing structures

The approach delivered a cost-effective refurbishment while ensuring the bathrooms were ready in time for the start of the new academic year.

Conclusion

The Manchester College project highlights how college bathroom refurbishment can modernise student facilities while keeping costs and disruption under control.

By combining architectural vinyl wrapping with coordinated refurbishment works, Fusion Surfaces delivered a vibrant transformation that aligns with the college’s branding and supports a better experience for students using the facilities.

why fusion surfaces?

GET IN TOUCH TODAY!

Follow Us

MESSAGE

GET IN TOUCH TODAY!

Follow Us

MESSAGE

Rosie Christie

Co-Founder

Older than the rest of the team, but not necessarily wiser as she’d like to think. There’s not an activity under the sun that she’s not been willing to have a go at, resulting in a mediocre ukulele player, part-time blogger, one-time skydiver and an unfinished sitcom script. There’s no room for shades of grey in this half of the partnership; everything comes down to looking after people who are important.

Organising tradesmen is not a task for the fainthearted. But recruiting the right tradesmen, ones who align with our values and are highly skilled at what they do makes for a much more harmonious project management process. Rosie’s role begins with a meeting to discuss your requirements, providing you with a quotation and carries through to the on-site management of your project.

Jade Mitchell

Co-Founder

She’s the only Southerner on the team, but we try not to hold it against her too much. If anything, we’ve enjoyed introducing Jade to a vast number of pie shops now she’s a Northern resident. Standing at a phenomenal 5’2”, she is living proof that big things come in small packages; a mix of infectious enthusiasm, laughter, loyalty, authority and uncanny Theresa May impressions.

Communicating with our clients is Jade’s forte. Being highly organised and placing customer satisfaction at the forefront of everything she does means that from enquiry to completion, your queries will be dealt with efficiently. For an in depth knowledge of the material specification of our interior film, Jade is your woman. She will put your mind at rest that not only do we install this product, but we make sure that is the most suitable for your needs.