o2 Arena

The Brief

The O2 Arena needed to refresh its hospitality boxes, which were beginning to look tired and outdated. A full replacement wasn’t feasible due to time constraints and event scheduling, so they approached Fusion Surfaces to help transform the space using vinyl wrap. The brief: modernise the built-in bar units and fitted furniture, with minimal disruption to the venue’s packed calendar.

Location:
London
Duration:
8 days
Sector:
Sports & Leisure

The Solution

We proposed architectural vinyl wrapping as the perfect low-disruption alternative to replacement. Working closely with the O2’s team, we supplied a range of finishes tailored to the look they wanted to achieve. The final choices were a dark Marquina marble effect and a painted dark grey woodgrain, both from the LX Hausys range – ideal for delivering a premium, contemporary look.

The Process

We began with two trial boxes in July, allowing the client to see the finishes and quality up close. After receiving positive feedback, the scope was expanded to include frosted film on the fridge doors and bar glass panels for a more cohesive design.
Given the arena’s demanding schedule, work had to be completed between events, often with only 6-hour access windows. Our team completed the job over two working days each week throughout August, averaging four boxes per day, with strict attention to logistics and timing.

The Transformation

The visual upgrade was immediate and striking. The previously dark, traditional wood tones were replaced with clean, modern finishes that brought the space up to the standard expected at a world-class venue. The marble and grey wood tones complemented the lighting and layout of the boxes, delivering a more premium guest experience without the cost or disruption of full refurbishment.

Client Advantages

  • Full transformation without removing existing furniture

  •  Zero disruption to event operations

  •  Access challenges overcome with phased delivery

  •  Premium finishes delivered on a tight schedule

  • Cost-effective solution compared to full replacement

why fusion surfaces?

GET IN TOUCH TODAY!

Follow Us

MESSAGE

GET IN TOUCH TODAY!

Follow Us

MESSAGE

Rosie Christie

Co-Founder

Older than the rest of the team, but not necessarily wiser as she’d like to think. There’s not an activity under the sun that she’s not been willing to have a go at, resulting in a mediocre ukulele player, part-time blogger, one-time skydiver and an unfinished sitcom script. There’s no room for shades of grey in this half of the partnership; everything comes down to looking after people who are important.

Organising tradesmen is not a task for the fainthearted. But recruiting the right tradesmen, ones who align with our values and are highly skilled at what they do makes for a much more harmonious project management process. Rosie’s role begins with a meeting to discuss your requirements, providing you with a quotation and carries through to the on-site management of your project.

Jade Mitchell

Co-Founder

She’s the only Southerner on the team, but we try not to hold it against her too much. If anything, we’ve enjoyed introducing Jade to a vast number of pie shops now she’s a Northern resident. Standing at a phenomenal 5’2”, she is living proof that big things come in small packages; a mix of infectious enthusiasm, laughter, loyalty, authority and uncanny Theresa May impressions.

Communicating with our clients is Jade’s forte. Being highly organised and placing customer satisfaction at the forefront of everything she does means that from enquiry to completion, your queries will be dealt with efficiently. For an in depth knowledge of the material specification of our interior film, Jade is your woman. She will put your mind at rest that not only do we install this product, but we make sure that is the most suitable for your needs.