The Woodland Spa

The Brief
The award-winning Woodland Spa in Burnley recently underwent a massive £16 million expansion to enhance its luxury offerings. As part of this development, the spa’s management at Crow Wood Leisure sought a quick, cost-effective solution for upgrading their lift surrounds, vanity units, and IPS panels. The goal was to ensure minimal downtime for spa guests while blending with the spa’s fresh, modern look.
Location:
Burnley
Duration:
2 days
Sector:
Leisure & Sport
The Consultation
To kick things off, we conducted a detailed site survey and coordinated closely with the Crow Wood Leisure team. This planning stage was crucial for determining the scope of work and preparing for potential challenges—like keeping the lifts operational throughout the refurbishment. By mapping out each step, we ensured that guests could still enjoy the facilities without noticing any significant disruptions.
The Process
Our experienced installer spent just two days on-site, focusing on a few key upgrades:
- Lift Surrounds: These were first boarded over with MDF, then prepped thoroughly to create a solid base for the architectural film. Proper preparation ensured that the film adhered correctly and wouldn’t fail down the line.
- Vanity Units & IPS Panels: Each unit was carefully wrapped to match the spa’s sleek new style, protecting them against wear and tear while giving them a high-end finish.
The Transformation
With only one installer on the job, the transformation was swift but precise. The lifts, vanity units, and IPS panels fit into the spa’s upgraded ambiance, reflecting the luxurious tone set by the multi-million-pound expansion. Guests entering the lifts or using the facilities would never guess that a speedy vinyl wrapping process was behind the new look—everything appeared custom-built.
The Outcome
In just two days, we were able to deliver a fresh, premium aesthetic for the Woodland Spa, complementing the larger-scale expansions without causing a ripple in day-to-day operations. The lifts remained in use, and visitors continued to enjoy their experience without inconvenience—exactly as planned.


Client Advantages
- Speed of Install: The quick turnaround minimised downtime for a busy and high-profile establishment.
- No Lift Closure: By coordinating carefully, we avoided taking any lifts fully out of service, preserving the spa’s smooth flow of guests.
- Significant Cost Savings: Wrapping existing structures rather than replacing them cut both material and labour costs.
- Long-Term Durability: Thorough preparation ensured an enduring finish, matching the spa’s top-tier standard of service.

Conclusion
By leveraging architectural film, the spa could focus on its grand £16 million expansion without experiencing any downtime or disruption to guests. The result is a stylish, high-quality upgrade that perfectly complements the spa’s luxurious atmosphere—and all completed swiftly, cost-effectively, and with minimal fuss.
Interested in exploring similar upgrades? Get in touch to discover how architectural wrapping can refresh your space without slowing you down.